Summary of the procedure
 

Where to go? (2)

You will have to go to the following agencies. The number indicates how many interactions are required with each entity.
City of Kigali (x 6)
1 2 3 4 6 7
City of Kigali
Bank of Kigali
5
Bank of Kigali

What you will get (1)

The objective of the procedure is to obtain those documents.
Construction permit
7
Construction permit

Required documents 

The documents with green band will be provided to you during the procedure.

Application letter for construction permit
1
Application letter for construction permit
Application form for construction permit
1
Application form for construction permit
Project brief for construction permit (x 2)
1 3
Project brief for construction permit
Location maps
1
Location maps
Topographical map
1
Topographical map
Conceptualised site plan
1
Conceptualised site plan
Stamped construction permit request letter (x 2)
2 4
Stamped construction permit request letter
Preliminary design approval letter
3
Preliminary design approval letter
Deed plan
3
Deed plan
Full ownership title
3
Full ownership title
Certificate of registration of emphyteutic lease
3
Certificate of registration of emphyteutic lease
Perspective vis a vis surroundings
3
Perspective vis a vis surroundings
Location maps
3
Location maps
Topographic map
3
Topographic map
Site plan
3
Site plan
Bills of quantities
3
Bills of quantities
Soil test results
3
Soil test results
Environmental impact assessment certificate
3
Environmental impact assessment certificate
Architectural layout drawings
3
Architectural layout drawings
Structural drawings
3
Structural drawings
Plumbing and waste water Management plan
3
Plumbing and waste water Management plan
Water, plumbing and drainage drawings details
3
Water, plumbing and drainage drawings details
Fire safety plan
3
Fire safety  plan
General arrangement of artificial ventilation
3
General arrangement of artificial ventilation
Electrical, mechanical and telecommunication installation layout details
3
Electrical, mechanical and telecommunication installation layout details
Payment slip (construction permit BK)
5
Payment slip (construction permit BK)
Construction permit invoice
5
Construction permit invoice
Payment receipt (construction permit BK)
6
Payment receipt (construction permit BK)
Proof of identity
7
Proof of identity
Representatives
Proof of identity
7
Proof of identity
Power of attorney
7
Power of attorney

How much?

Free of charge

How long ?

The estimated total time is calculated by adding the time spent: 1) waiting in queue, 2) at the counter and 3) between steps.
  Min. Max.
Total time (sum): 17 d 24 d
of which:
Waiting time in queue (sum): 0mn 1h.
Attention at counter: 10mn 40mn
Waiting time until next step (sum): 17 d 24 d

Legal justification?

The regulations which justify the procedure and its content
Instruction No 01/10 of 30/05/2010 of Kigali City council setting prices for land lease and related Instruction No 01/10 of 30/05/2010 of Kigali City council setting prices for land lease and related
  Article 5
Prime minister's  instruction No 001/03.0 of 14/4/2010 Prime minister's instruction n° 001/03.0 of 14/4/2010
  articles 2, 3, 4