1.
Payment receipt (BNR) (original)
2.
EIA certificate (original, signed and with stamp) (original)
3.
Application letter for construction permit (original)
The letter should be addressed to CEO RDB with copy to the Head of SEZAR and the Head of Prime Economic Zones (the Developer).
4.
Project implementation plan (Simple copy)
5.
Environmental management plan. (Simple copy)
6.
Deed plan (original)
or sales agreement, if deed plan not yet available
7.
Project brief for construction permit (original)
8.
Two Perspectives vis a vis surroundings (original + 2 simple copies)
On A3 paper
9.
Topographic map (original + 2 simple copies)
On A3 paper
10.
Architectural layout drawings (4 simple copies)
On A0 paper
11.
Water, plumbing and drainage drawings and details (4 simple copies)
On A4 paper
12.
General arrangement of artificial ventilation (4 simple copies)
On A4 paper
13.
Electrical, mechanical or fibre optical installation layout details (4 simple copies)
On A4 paper
14.
Structural drawings, layout and details, including bar bending schedule and structural calculations (4 simple copies)
On A0 paper
15.
Bills of quantity (2 simple copies)
16.
Soil test results (Simple copy)
Where applicable
17.
Safety measure plan (Fire Management) (Simple copy)
Attention at counter:
Min. 10mn
- Max. 20mn
Waiting time until next step:
Max. 2 days
1.
RDB Public Notice - 17 March 2020
Additional information
1) All drawings/plans must be stamped and signed by the design consultancy firm.
2) All designs or Site improvement activities shall be done in conformity with the relevant Rwanda laws, regulations and guidelines.
3) Where applicable, the details of any special provisions for persons with disabilities shall be given on all plans drawings and diagrams.