Summary print

Preview & Print

Properties

certification bar

1
Submit preliminary design proposal
(last modified: 10/04/2019)

Timeframe ( ver detalles )

Espera hasta paso siguiente

5 mn  -  20 mn
5 days  -  7 days

Contact details

Entity in charge

City of Kigali

P.O. Box 3527 Kigali, Kigali
Tel: +250 572 255 575 / +250 958 576 967
Website: http://www.kigalicity.gov.rw/

Unit in charge

Kigali city construction one stop center

Mon: 07:00 - 19:00
Tue: 07:00 - 19:00
Wed: 07:00 - 19:00
Thu: 07:00 - 19:00
Fri: 07:00 - 15:00

Person in charge

Mr. Nyamurangwa Emmanuel

Tel: +250 788 438 535
Email: nyamurangwa2005@yahoo.com

Expected results

Stamped construction permit request letter

Requirements

1. 01 - Libre deuda de patente
Application letter for construction permit (2 original )
signed by the promoter/developer
2. Application form for construction permit
Application form for construction permit (original)
duly filled and stamped by all parties involved : engineering, architectural. supervision company
3. 01 - Libre deuda de patente
Project brief for construction permit (original)
4. 01 - Libre deuda de patente
Location maps (original)
5. 01 - Libre deuda de patente
Topographical map (original)
6. 01 - Libre deuda de patente
Conceptualised site plan (original)

Time frame

Waiting time in queue: Max.  10mn
Attention at counter: Min.   5mn - Max.   10mn
Waiting time until next step: Min.   5 days - Max.   7 days

Legal justification

The requirements for preliminary design proposal were decided by Kigali City council

Additional information

Clients are advised to make pre-consultation with one stop center technical staff as incomplete applications are not accepted.

Additional information on requirements
- Application letter (addressed to the Mayor of City of Kigali), with signature, registration and the following statement: “By entering my name below, I herby attest, under the penalties of perjury, that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Further, I am authorized to submit this application to the District/City or have ownership of the subject property.“


Project Brief: descriptive summary on the project highlighting type of project, compliance to zoning guidelines (Building coverage, Landscape coverage, Floor Area Ratios etc) and Rwanda building control regulations (Access for people with disabilities, emergency provisions etc), cost of project and implementation plan among others.

Location maps
i. Point location on Kigali Conceptual Master Plan map ii. Map over Google Earth or aerial images, scale 1:2000, highlighting transportation access (with future major road right of ways) and existing major utility lines (water, electricity, telephone, sewer, fiber optics and gas) iii. Map on Google Earth or aerial image, scale 1:1000 showing existing land use surrounding site (typologies such as residential, commercial, institutions industrial, etc. )

d.Topographical map showing wetlands (REMA mapped), contours, slope analysis (highlighting slopes > 20%) existing drainage and existing trees larger than 5 m tall or wide.

e.Conceptualized Site Plan (with building footprint, rough paving (parking, roads and sidewalks), and setbacks. A site plan should include:
o An arrow indicating the true north
o The scale of the drawing
o Property lines( According to the Deed plan)
o Outline of existing(if any) and proposed buildings and structures o The dimensions of the existing(if any) and new buildings
o Distance between buildings
o Distance between buildings and property lines (setbacks)
o Parking lots, indicating parking spaces (with provision for the disabled) o Driveways
o Adjacent streets and any easements.
o Landscaped areas
o A clear indication of the proposed addition or alteration (if any). o Summary of the area covered by each existing or site improvement (including Existing development)
o Service drawings showing any existing service and proposed points of connection.
o Any existing and intended point of access from any streets, and street lighting, apparatus or equipment relative to the access.

f. Proposed façade perspective of the building. Rough massing model in 3d or elevations from 4 sides is not mandatory but will aid analysis.

Who certified this information ?

Emmanuel INGABIRE, Director , 27/10/2011

Recourse: City of Kigali

Entity in charge

City of Kigali

P.O. Box 3527 Kigali, Kigali
Tel: +250 572 255 575 / +250 958 576 967
Website: http://www.kigalicity.gov.rw/

Unit in charge

Kigali city construction one stop center

Mon: 07:00 - 19:00
Tue: 07:00 - 19:00
Wed: 07:00 - 19:00
Thu: 07:00 - 19:00
Fri: 07:00 - 15:00

Person in charge

Ms. Lilian Uwanziga Mupende

Director of urban planning and one stop center
Tel: +250 788 849 399
Email: lmupende@kigalicity.gov.rw, lmupende@yahoo.com
Powered by eRegulations ©, a content management system developed by UNCTAD's Business Facilitation Program and licensed under Creative Commons License